Monday, August 31, 2009
Friday, August 28, 2009
Still nearly there
So close..but a few things still to be done... We should be living in it by september, if not i will be in mental home.
Water and oil burner electrics still have to be done..hook up burner and pump into house. (wes)
Painting will be completed today...
Kitchen half installed..need to move two plugs and appliances to be installed
Doors and skirting to be done by myself and ivan..3 doors hung already..10 to go...
Sanitaryware: All shower units in and sanitary ware installed.
Groundworks should be complete this weekend...percolation grid to be made with pipes and connected up..also filling around site...Manhole to be build around well area for future access.
Will need holiday after this, but unfortunatley funds will be low. Quick tip if you decide to build a house remember you will have alot of delays and may become frustrated. So just take a deep breath and have a beer , it will be worth it in the end. A year from now i will be asking myself what was all that about.(or maybe how am i going to pay for all this)
Water and oil burner electrics still have to be done..hook up burner and pump into house. (wes)
Painting will be completed today...
Kitchen half installed..need to move two plugs and appliances to be installed
Doors and skirting to be done by myself and ivan..3 doors hung already..10 to go...
Sanitaryware: All shower units in and sanitary ware installed.
Groundworks should be complete this weekend...percolation grid to be made with pipes and connected up..also filling around site...Manhole to be build around well area for future access.
Will need holiday after this, but unfortunatley funds will be low. Quick tip if you decide to build a house remember you will have alot of delays and may become frustrated. So just take a deep breath and have a beer , it will be worth it in the end. A year from now i will be asking myself what was all that about.(or maybe how am i going to pay for all this)
Tuesday, August 11, 2009
August 09 - nearly there

Getting close now..just have a few niggly bits to tie up..Oil tank has to be connected(thanks to ivan -built up blocks for tanks)..water needs to be brought from well pump etc...We got power in house on friday 7th august..wesley wired whole mains box. Inside tiling an painting still in progress. Kitchen will be deilverd next week to be fitted....doors arriving this week to be fitted......along with skirting boards. (at least tiler is using tile as skirting in all bathrooms, will save us fitting even more skirting)
Plumber has installed most of sanitory ware....hoping to be moved in around end of september./ start of october. fingers crossed..